Ready to fix validation chaos? Book Review
Requirements and Traceability

GxP Software URS: How to Write Requirements That Control Risk

\1**\1**\1.

Each requirement should be necessary, unambiguous, testable, and linked to the risk or control it supports.

Start with intended use

Write the intended use and process boundary before listing features. State who uses the system, what regulated records or decisions it supports, which interfaces matter, and what is outside scope. This prevents a requirements document from becoming a shopping list.

The intended use also gives the validation team a basis for determining whether a function is direct impact, indirect impact, or outside the quality assessment. That classification should be documented rather than implied.

Make each requirement testable

Use one observable behaviour per requirement. 'The system shall prevent an unauthorised user from approving a batch record' is stronger than 'the system shall be secure.' The first statement can be challenged with a defined test and evidence.

Include conditions and outputs where they matter. Name the role, record, trigger, status, calculation, notification, or audit event. Avoid subjective terms such as user-friendly, fast, or appropriate unless the requirement defines how they will be assessed.

Cover more than features

Requirements should address workflow, data, roles, audit trails, electronic signatures, interfaces, availability expectations, reporting, backup and restore, retention, training, and change control where relevant. A feature list alone will miss the controls that make the process defensible.

For electronic records and signatures, use the applicable regulation and company procedures as the source of the control objective. The Part 11 controls checklist is a useful companion, not a substitute for a system-specific assessment.

Link requirements to risk

Assign an identifier to every requirement and connect it to a risk, control, or business need. High-risk requirements normally need stronger challenge and clearer evidence. Low-risk requirements still need an outcome, but not every item needs the same testing depth.

Do not inflate risk ratings merely to justify more pages. The purpose of risk-based validation is to make the important controls visible and test them well.

Control review and change

Approve the URS before detailed configuration or formal testing. When a requirement changes, assess the impact on design, configuration, test coverage, training, and release evidence. Preserve the history so reviewers can understand why the change occurred.

Weak wordingBetter wording
The system shall be secure.The system shall lock an account after the configured number of failed authentication attempts and record the event.
Reports shall be accurate.The approved report shall calculate the defined fields from the named source records and display the approved revision identifier.
Users shall have access.Users assigned the Reviewer role shall be able to view records in their site scope but shall not approve them.

FAQ

Is a URS the same as a functional specification?

No. The URS states user and process needs. A functional or configuration specification explains how those needs will be delivered.

How many requirements should a URS contain?

There is no useful universal number. It should cover the intended use and relevant controls without duplicating every design detail.

Can vendor documentation replace the URS?

Vendor documentation can support understanding of capabilities. It does not define your intended use, risks, roles, or acceptance criteria.

When should the URS be approved?

Before configuration and formal testing rely on it. Later changes should move through controlled change management.

Decision rule: choose evidence from the consequence of failure, the control being relied on, and the ability to detect a problem. A larger document set is not automatically stronger. Clear scope, reproducible evidence, and an approved conclusion are what make the decision defensible.

Keep the rationale with the controlled record. Future reviewers should be able to see what was considered, what was tested or reviewed, what remains uncertain, and who accepted the residual risk.

During review, compare the approved requirement with observed use, current configuration, and retained evidence. That simple comparison often finds drift before an auditor does.

For related work, read our validation traceability matrix guide.

Bring validation work under control

VLMS Software helps healthcare teams organise validation, evidence, and audit readiness around the work that matters.

Talk to VLMS Software